- YEAR2015
- LOCATIONRiyadh, Saudi Arabia
- VALUESAR500.0 million
- MANDATE PERIOD1 YEAR
- AUTHORITYMinistry of Defense
- CONCESSIONAIRECROSSMOBILE, GmbH
- CONTRACTORSUniservArabia LLC
- OPERATORMultiple
- PMOUniservArabia LLC
PROGRAM DESCRIPTION:
Supplier: Crossmobile SAXAS, GmbH, Germany.
Size: 200 beds (4) military hospital on trucks.
Project Cost: SAR500 Million+.
Program Completion: 2015.
MOBILE MILITARY TRUCK HOSPITALS:
The 50 Bed Hospital fully mobile on trucks (please find complete lay out of the hospital). Hospital composed of total of 29 trucks and total of 24 trailed truck can be towed during movement. Each truck and attached shelter must have its own integrated system (e.g. power supply with UPS curability, air conditioning). Each shelter and connecting corridors must be supplied with complete piping system for fresh water, sewage, communication and electronically network which can be integrated with each other to form complete network for the hospital. All networks should be connected the connection services shelter where other services trucks such as waste water, fresh water generator shelters can be connected.
PROGRAM TAEM
Brigadier General Dr. Mohammed Al-Daghriri, Lead. Military Medicine, MODA.
Eng. Josef Mayer, Lead Engineer, Germany.
Eng. Nasser Ahmed, Lead Design, TTG, USA.
Eng. David Nuferi, Lead Planner, TTG, USA.
Eng. Mohammed Fahmy, Lead Project Management.
Shawkatt Raghib, MD, Program Lead.
GEENRAL DESCRIPTION
All major medical modules of the mobile hospital shall be placed in lightweight containers (shelters). The shelters shall consist of a steel frame and aluminum sandwich panels for roof and sidewalls. The medical modules require the use of the following shelter types: Non-expandable shelter, Double -side expandable shelter, One-side expandable shelter. The medical modules shall be designed and built to stand all requirements in terms of functionality, safety, lifetime, and ergonomics that are described in the present specifications.
GREENVERSE CONSORTIUM (GVC) is a global program and projects management consortium founded and managed by THE D I O R GROUP for Projects Management in Middle East & Africa, 2024-2050 with BOT Projects Portfolios amounted to $50.0+bn under PMO management of THE D I O R GROUP. GVC’s Technical Consortium house the global blue-chip EPCs form USA, China and EU, while GVC’s Financial Club attracted global financing institutions and local development banks, etc.
At GREENVERSE CNSORTIUM, we foster a platform for knowledge exchange, capacity building, ESG framework and adoption of disruptive projects management methodologies, to bridge projects lifecycle gaps in Middle East & Africa
For more information:
THE D I O R GROUP
1700 Seventh Ave. Suite 2100 Seattle, Washington 98101 United States
+1 (206) 561-9407
— CORPORATE OFFICES:
T: +1 (206) 561-9407 Seattle, WA
T: +1 (646) 601-6509 New York, NY
T: +2 (02) 2461-8555 Cairo, Egypt
T: +966 54 151-3030 Riyadh, Saudi Arabia
info@thediorgroup.com | www.thediorgroup.com